Tekmar Boiler Control 265 Manual. Web a dhw aquastat or setpoint control is used as a switch in the dhw demand circuit. Web this external relay is interlocked with the boiler 3 / dhw contact.
Web this external relay is interlocked with the boiler 3 / dhw contact. One boiler control 265, one outdoor sensor 070, two universal sensors 071, data brochures d 265, d 070, d 001, application brochure a 265, four. Web a dhw aquastat or setpoint control is used as a switch in the dhw demand circuit.
Web The Control Functions Of Each Adjustable Item Are Described In The Sequence Of Operation.
The 265 uses a liquid crystal display (lcd) as the method of supplying information. The tekmar boiler control 268 can control the supply water temperature from up to 9 on / off stages based on outdoor temperature, control for domestic hot. Once the control detects a dhw demand, the dhw demand pointer turns on in the lcd and.
The Control Calculates A Boiler Target Supply Temperature Based On The.
One boiler control 265, one outdoor sensor 070, two universal sensors 071, data brochures d 265, d 070, d 001, application brochure a 265, four. Web this external relay is interlocked with the boiler 3 / dhw contact. Web the tekmar boiler control 265 can control the supply water temperature on up to three modulating boilers based on outdoor temperature or setpoint requirements.
The Control Is Designed To Operate.
The maximum boiler output range is from 10,000 btu / hour to 19,990,000. Web when using the control to provide domestic hot water (dhw) requirements, only two modulating boilers can be operated. The boiler control 260 is designed to control a single stage heat source in order to provide outdoor reset or domestic hot water (dhw) operation.
Web A Dhw Aquastat Or Setpoint Control Is Used As A Switch In The Dhw Demand Circuit.
Web the boiler control 262 is a micro processor based control designed to maximize the comfort and efficiency of a hydronic heating system. There is no power available on these terminals from the. Web the boiler pump 1 to boiler pump 3 terminals (23 and 24, 25 and 26, 27 and 28) are isolated outputs in the control.
During A Dhw Demand, The Control Closes The Primary Pump (Prim P1) Contact And The Boiler 3 / Dhw Contact.
Tekmar boiler control 263 data brochure (36 pages) brand: Web if the control is not in warm weather shut down (wwsd), the control closes the primary pump contact. Web this allows the control to properly operate the boilers using either sequential or parallel modulation.